PROJECT BACKGROUND
The Al-Fidaa Foundation has been involved in managing donor funded borehole projects since 2019. The Al-Fidaa Foundation has successfully drilled a number of boreholes in the Eastern Cape
PROJECT GOALS
- The school or clinic will have their own reliable source of water for drinking and sanitation.
- The water supply will be linked up to the school’s or clinics’s plumbing infrastructure providing full water services whenever it is required.
- Residents surrounding the school or clinic will have access to water during water cuts or when day zero arrives
Area | Type | Adresss |
---|---|---|
Korsten | Community | 239 Durban Road |
Schauderville | Community | 22 Dinsmore Road |
Helenvale | Community | 94 Renecke Street |
Westering | Community | 27 Papenkuils Road |
Gelvandale | School | Corner Bell Road & beetlestone Road |
Walmer | Clinic | 9 yoyo Street, Schoenmakerkop |
Idutywa | School | Maputi Primary School Borehole |
King Williams Town | Community | Kalana Borehole |
King Williams Town | School | Kalana Primary School Borehole |
Madiba Village | School | Mzamomhle Junior Secondary School Borehole |
Ngquto Village in Idutywa | School | Lower Falakahla Primary School Borehole |
Colosa Village, Idutywa – Vulindlela Primary School Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Vulindlela Primary School, Colosa Village, Idutywa – Borehole no 5.
The distance from this village to the town of Idutywa is about 10km. This village is divided into three areas. Total population of all three areas is approximately 3500 people. All these areas need water; sometimes children have to take turns to go to school, so that some of them can go for the search water in mountains and rivers. A borehole will be a big relief and better life for these communities.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
- The First Phase was to divine the drilling location and then drilling of the borehole.
- The Second Phase (contractors Rayco Electrical) was to install borehole pump, the tank stand and the tank installation, including a flout switch so that the water in the tank doesn’t overflow.
- Trenching for the water pipes and cabling.
- 3 taps are connected to this borehole; 2 taps for the school use and 1 tap for the community.
- Sending of water samples to laboratory to confirm safety for consumption.
CHALLENGES: The main challenge was procuring service providers in the Eastern Cape, causing delays.
Idutywa – Colosa Secondary School Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Colosa Secondary School in Idutywa – (Distance from Town of Idutywa is about 10 km).
Identified by the Al-Fidaa Foundation team as an area in dire need of water where residents, including children have to take turns to go in search of water in the mountains and rivers.
A Borehole will be a big relief and contribute to a better life for this community.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
The installation of the borehole pump and tank including tank stand now is complete.
Three taps supply water from this borehole.
Two taps are for the school use and one tap is for the community.
The water will be sent to the laboratory first to confirm safety for consumption.
Idutywa Maputi Primary School Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Maputi Primary School Idutywa
Identified by the Al-Fidaa Foundation team as an area in dire need of water where residents, including children have to take turns to go in search of water.
A Borehole will be a big relief and contribute to a better life for this community.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
The installation of the borehole pump and tank including tank stand now is complete.
Three taps supply water from this borehole.
Two taps are for the school use and one tap is for the community.
The water will be sent to the laboratory first to confirm safety for consumption.
King Williams Town – Kalana Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Kalana – Borehole no. 1: This village is about 30km from King Williams Town. The population of this village is approx. 2000. The village does not have any water except rainwater when available. Residents either buy water or those who can’t afford to buy are forced to walk 700 m to 1,5 km down steep hill terrain to collect water from a tap that is meant to be used for a chemical dip for the livestock.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
- The First Phase was to divine the drilling location and then drilling of the borehole.
- The Second Phase (contractors Rayco Electrical) was to install borehole pump, the tank stand and the tank installation, including a flout switch so that the water in the tank doesn’t overflow.
- Trenching for the water pipes and cabling.
- 3 taps are connected to this borehole; 2 taps for the school use and 1 tap for the community.
- Sending of water samples to laboratory to confirm safety for consumption.
- 99% complete; a borehole cover is still needed.
King Williams Town – Kalana Primary School Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Kalana Primary School – Borehole no. 1: This village is about 30km from King Williams Town. The population of this village is approx. 2000. The village does not have any water except rainwater when available. Residents either buy water or those who can’t afford to buy are forced to walk 700 m to 1,5 km down steep hill terrain to collect water from a tap that is meant to be used for a chemical dip for the livestock.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
- The First Phase was to divine the drilling location and then drilling of the borehole.
- The Second Phase (contractors Rayco Electrical) was to install borehole pump, the tank stand and the tank installation, including a flout switch so that the water in the tank doesn’t overflow.
- Trenching for the water pipes and cabling.
- 3 taps are connected to this borehole; 2 taps for the school use and 1 tap for the community.
- Sending of water samples to laboratory to confirm safety for consumption.
- 99% complete; a borehole cover is still needed.
Madiba Village – Mzamomhle Junior Secondary School Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Mzamomhle Junior Secondary School – Borehole no. 6 (Madiba Village, about 12km from the town of Butterworth).
Identified by the Al-Fidaa Foundation team as an area in dire need of water.
The village consists of approximately 2000 people, some of whom live in shacks. The school collects rain water to try and lighten the burden.
A Borehole will be a big relief and contribute to a better life for this community.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
- The First Phase (completed months prior to phase 2) was to divine the drilling spot and the drilling of the borehole.
- The Second Phase (contractors Rayco Electrical) was to install borehole pump, installing of tank stand and the tank installation, including a flout switch so that the water in the tank doesn’t overflow.
- Trenching for the water pipes and and cabling.
- Three taps are connected to this borehole; two taps for the school use and one tap for the community.
- Water samples to be sent to laboratory to confirm safety for consumption.
Ngquto Village in Idutywa – Lower Falakahla Primary School Borehole
PURPOSE
To ensure a reliable, continuous supply of water to already poverty-stricken communities in the Eastern Cape.
SITE OF BOREHOLE
Lower Falakahla Primary School, Ngquto Village in Idutywa – Borehole no 7.
The village is made up of few villages with different names. Approximately 3000 to 3500 people stay here. Water is very valuable to these villages; there is no clean water for drinking. Whatever little water they get, they have to work hard to get it. Sometimes they stay without water for days due to the streams having run dry. Those who can afford, buy water and fill up their tanks. The fields are large useless due to the drought. Water is life for these villagers; even the filthy water regarded as unfit for human consumption, for them, is like gold. A borehole will play a signifivant role in safeguarding the life and health of the people, bringing relief and better life for these communities.
PROGRESS ON MAIN ACTIVITIES AND PREPARATION
- The First Phase was to divine the drilling location and then drilling of the borehole.
- The Second Phase (contractors Rayco Electrical) was to install borehole pump, the tank stand and the tank installation, including a flout switch so that the water in the tank doesn’t overflow.
- Trenching for the water pipes and cabling.
- 3 taps are connected to this borehole; 2 taps for the school use and 1 tap for the community.
- Sending of water samples to laboratory to confirm safety for consumption.
CHALLENGES: The main challenge was procuring service providers in the Eastern Cape, causing delays.